English

MENU

English

MENU

English

MENU

English

MENU

Office move guide

Office move guide

The office move toolkit

The office move toolkit

Planning an office move? These are the tools, comparisons and real-world examples referenced throughout the guide.


Use them to plan your move, make the case for your decisions and work out what needs to happen before the design is fixed.

Planning an office move? These are the tools, comparisons and real-world examples referenced throughout the guide.


Use them to plan your move, make the case for your decisions and work out what needs to happen before the design is fixed.

Red Dot 2024 · NPS 90 · 600+ companies · 10+ countries

Tools

Five downloads in the order you'll need them.

The staff survey and workshop

A ready-to-run session for finding out how your team actually works, before anything is drawn.

The office move decision timeline

The complete phase-by-phase checklist of what to decide and when, plus a fit-out hydration check.

The REFILL+ Series 2 fit-out and specification guide

Dimensions, cabinet sizes, and the exact water, waste and power a built-in hydration point needs, in the form your architect or contractor can work from. Send it before the design freeze.

The three-year cost sheet

What bottled water and built-in hydration each cost over three years, worked out for offices of 50, 150 and 250 people, with the annual totals and the bottles and CO₂ each one avoids. Ready to take to your finance team.

Bottled, coolers or built-in

The full comparison of bottles and cans against coolers and a REFILL+ built-in, clearly outlined and ready to take to your team.