How to plan the move: a Q&A with Annika, work.club
Annika has run the operational side of dozens of move-ins. She shares practical advice for anyone organising one themselves:
Where do you actually start?
“Ask for the measurements of the office first, you can get them from the property manager. Then start looking for furniture.”
How many quotes are needed, at a minimum?
“Three. Compare the cost, but also the delivery time, that’s so important.”
What has to be ordered first?
“Furniture, because the delivery time is the longest, and you can’t work without desks and chairs. Plants come later.”
How long does a move really take?
“For a plug-and-play office, about a month. From scratch, more like half a year. Finding the right suppliers takes the longest.”


Where do people get the timing wrong?
“The contract gets signed fast and the check-in gets planned fast, so there’s no time to make sure everything’s actually in the office on time. Sometimes I’m brought in a week before, sometimes a few days.”
What’s one thing that most people forget?
“Check everything before check-in. I go to the office straight away and go through it: does it all work, is it clean. Fix it before people arrive.”
And how do you stay on track?
“I make a list with the timing and the to-dos with everything on it, in order.”
More resources

Previous article
Tebi: reading the room, and building the healthy choice in
For Tebi's workplace experience manager, Stacy Bergener, a good office move begins by knowing your people and trusting your gut.

Next article
Making sense of the standards
The main standards fall into two families: those that measure how a building treats the people inside it, and those that measure how the building itself performs.
Don't stop here
There's a lot more where this came from
You just read one article out of a whole edition, but the full edition is yours to download (for free)